JTKSM Licence C · No. 657 · Est. 2018
Updated 2026 · 12 min read

Act 446 Workers' Hostel Compliance in Malaysia (2026 Requirements)

A complete guide to the Workers' Minimum Standards of Housing, Accommodations and Amenities Act 1990 (Act 446) — JTKSM certification, compliance requirements, inspections, and employer responsibilities.

Trusted by 900+ employer clients · managing 5000+ hostel beds under JTKSM Licence C · No. 657.

RM50KMax Fine Per Worker
2 yrsMax Imprisonment
21–45Working Days to Approval
3 yrsCertificate Validity
Act 446 Overview

What Is Act 446?

The Workers' Minimum Standards of Housing, Accommodations and Amenities Act 1990 (Act 446) is Malaysia's primary legislation governing worker accommodation standards, administered by JTKSM under the Ministry of Human Resources (MOHR).

Employers providing accommodation for 5 or more workers must obtain a Certificate of Accommodation from the Director General of Labour before housing workers — verified through rigorous inspection of physical standards and facility requirements.

All applications are submitted through the official JTKSM portal at akta446.mohr.gov.my.

Accommodation compliance isn't just a standalone obligation — hostel certification is also checked as part of the foreign worker eQuota approval process, so gaps here can delay or block new quota applications.

Administered By

Jabatan Tenaga Kerja Semenanjung Malaysia (JTKSM) under the Ministry of Human Resources (MOHR).

Legal Authority

Federal legislation with enforcement powers including fines, imprisonment, and hostel closure orders.

Primary Purpose

Protect worker welfare by ensuring safe, healthy, and dignified living conditions in employer-provided accommodation.

Ringkasan Bahasa Malaysia

Akta 446: Apa Yang Perlu Majikan Tahu

Akta Standard Minimum Perumahan, Penginapan dan Kemudahan Pekerja 1990 (Akta 446) adalah undang-undang utama yang mengawal selia standard penginapan pekerja di Malaysia, ditadbir oleh Jabatan Tenaga Kerja Semenanjung Malaysia (JTKSM) di bawah Kementerian Sumber Manusia (KESUMA).

Majikan yang menyediakan penginapan untuk 5 pekerja atau lebih wajib memperoleh Sijil Penginapan daripada Ketua Pengarah Tenaga Kerja sebelum menempatkan pekerja — disahkan melalui pemeriksaan fizikal premis.

Kegagalan mematuhi Akta 446 boleh membawa kepada denda sehingga RM50,000 bagi setiap pekerja dan penjara sehingga 2 tahun di bawah Seksyen 24D, di samping penggantungan kuota pekerja asing. Permohonan sijil dibuat melalui portal rasmi JTKSM di akta446.mohr.gov.my, dengan tempoh kelulusan lazimnya 21–45 hari bekerja dan sijil sah selama 3 tahun.

Ringkasan Pantas

  • Wajib untuk 5 pekerja atau lebih
  • Denda: sehingga RM50,000 seorang pekerja
  • Penjara: sehingga 2 tahun (Seksyen 24D)
  • Sijil sah: 3 tahun
  • Permohonan: akta446.mohr.gov.my
The Permit, Explained

JTKSM Certificate of Accommodation: What It Covers

The Certificate of Accommodation is the permit issued by JTKSM under Act 446 once a hostel passes document review and physical inspection. It confirms the premises meet minimum standards for space, sanitation, ventilation, and fire safety, and it must be displayed at the hostel.

It is a separate document from the Certificate of Completion and Compliance (CCC) issued under building law, which is one of the supporting documents an employer submits as part of the Act 446 application (see Step 2 below) — not the Act 446 certificate itself.

Certificate of Accommodation, at a Glance

  • Issued by: JTKSM, Director General of Labour
  • Required for: employers housing 5+ workers
  • Valid for: 3 years from issuance
  • Must be: displayed at the hostel premises
Legal Risk

Act 446 Penalties for Non-Compliance

Act 446 compliance is a legal obligation, not a discretionary standard. Non-compliance carries severe legal, financial, and operational consequences.

Critical Legal Warning — Section 24D Criminal Penalties

Under Section 24D(1) of Act 446, employers whose foreign worker accommodation fails to meet prescribed minimum standards are guilty of an offence and, upon conviction, liable to:

  • Imprisonment for a term not exceeding two (2) years
  • Fine not exceeding RM50,000 per affected worker
  • Both imprisonment and fine for serious violations
ConsequenceDetailBusiness Impact
Criminal prosecution (Sec. 24D)Imprisonment up to 2 years for company directors/representativesCriminal record for responsible persons
Financial penaltiesUp to RM50,000 per violation per workerPenalties exceeding RM500,000 for medium-sized hostels
Immediate hostel closureClosure orders requiring urgent worker relocationBusiness continuity disruption, production stoppage
Foreign worker quota suspensionTemporary or permanent suspension of recruitment quotasBlocks new worker approvals and expansion plans
Certificate revocationRevocation of JTKSM Certificate of AccommodationInvalidates legal status of all hostel residents
FOMEMA Update

FOMEMA Housing Address Verification (2026)

Mandatory Housing Registration

Effective September 2026, employers must register and verify each foreign worker’s accommodation address via the FOMEMA portal. This requirement applies before PLKS issuance and is enforced under Act 446. Failure to register accurate housing details may result in levy forfeiture or permit cancellation.

Our Compliance Services

Our Act 446 Compliance Services

Agensi Pekerjaan Andaraya Sdn Bhd, in partnership with Andaraya (M) Sdn. Bhd., delivers comprehensive Act 446 compliance consultancy helping employers achieve and maintain JTKSM certification.

Hostel Setup & Planning

Complete JTKSM application preparation, compliance audits, layout planning, capacity calculations, and BOMBA fire safety coordination.

Risk Mitigation

Regular mock JTKSM inspections, inspection-ready documentation, advisory during enforcement, and quarterly compliance monitoring.

Documentation Management

Professional architectural floor plans, complete compliance packages, certificate renewal management, and digital record-keeping.

End-to-End Support

Pre-submission audits, floor plan preparation, documentation compilation, inspection coordination, and post-approval management.

Application Process

How to Get Your Hostel Act 446-Certified

Total duration: 21–45 working days from complete submission to final certificate issuance.

01

Pre-Application Compliance Assessment

Self-audit against Act 446 requirements — floor space, sanitation ratios, fire safety, ventilation, and building compliance.

02

Prepare Required Documentation

Architectural floor plans, Certificate of Completion and Compliance (CCC), BOMBA fire safety approval, building permits, and company registration documents.

03

Online Application Submission

Submit via the official JTKSM portal (akta446.mohr.gov.my), upload required documents, and pay prescribed fees.

04

JTKSM Document Review

Administrative review of submitted documents for completeness — typically 7–14 working days.

05

Physical Inspection Scheduling

On-site inspection scheduled once documents are approved — allow 3–7 working days for coordination.

06

On-Site Inspection Execution

Inspectors verify actual conditions against submitted plans — room dimensions, sanitation facilities, utilities, and fire safety equipment.

07

Post-Inspection Assessment

Deficiencies (if any) require rectification and re-inspection. Otherwise, proceed to certificate issuance (5–10 working days).

08

Certificate Issuance & Display

Certificate of Accommodation issued, valid for 3 years. Must be displayed prominently at hostel premises.

09

Post-Certification Monitoring

Certification is not the end of JTKSM's involvement — officers carry out follow-up and complaint-triggered inspections at hostels throughout the 3-year validity period, not only at initial certification or renewal. A complaint from a worker, a workplace incident, or a routine labour audit can each trigger an unscheduled visit. Keep your hostel continuously compliant, not just audit-ready at renewal time — a mid-cycle failure carries the same Section 24D penalties as a failed initial inspection.

Space Standards

Minimum Housing & Amenity Standards

Space calculations must use actual usable sleeping area only — excluding bathrooms, corridors, and fixed furniture footprints.

Private & Semi-Private Rooms

  • Minimum 3.6 m² usable floor space per worker
  • Maximum 4 workers per room
  • Minimum 2.4m ceiling height
  • 0.9m clearance for emergency pathways

Dormitory-Style Accommodation

  • Minimum 3.0 m² usable floor space per worker
  • Maximum 12 workers per dormitory room
  • Minimum 0.75m clearance between beds
  • Individual secure storage for each worker
Approved Building Types

Statutory Building Categories for Foreign Worker Hostels

Building CategoryCompliance StatusCritical Requirement
Landed ResidentialPre-ApprovedValid CCC & residential zoning
Shophouse / SoHoConditionalOfficial residential conversion approval
High-Rise ApartmentsPre-ApprovedManagement body (MC/JMB) consent
Purpose-Built CLQGold StandardJTKSM-verified from architectural design stage
Modular CabinsRestrictedAnnual temporary building permit required
Compliance Checklist

Act 446 Hostel Compliance Checklist

Key items JTKSM inspectors verify during a hostel certification inspection.

Building & Approval

  • Approved building type (hostel / CLQ)
  • Local Authority (PBT) approval obtained
  • BOMBA fire safety clearance current
  • Building plans match actual layout

Sleeping & Space Standards

  • Minimum floor area per worker (3.0–3.6 m²)
  • Approved bed structures with guard rails
  • Adequate aisle spacing (min 0.75m)
  • Maximum occupancy not exceeded

Sanitary & Hygiene

  • Sufficient toilets (max 1:6 worker ratio)
  • Sufficient bathrooms (min 1:15 worker ratio)
  • Continuous clean water supply
  • Documented cleaning schedules

Safety & Documentation

  • Fire extinguishers & marked exits
  • Individual lockers or personal storage
  • Certificate of Accommodation displayed
  • Updated worker occupancy records
FAQ

Act 446 Frequently Asked Questions

Does Act 446 apply only to foreign workers?
No. Following legislative amendments, Act 446 applies to all employers who provide accommodation for employees, regardless of nationality — covering both Malaysian and foreign workers.
Is employer-provided accommodation required to be certified?
Yes. Employers must obtain a Certificate of Accommodation before housing employees. Premises must comply with prescribed standards for space, sanitation, ventilation, safety, and essential facilities.
What's the difference between the Certificate of Accommodation and a CCC?
The Certificate of Accommodation is issued by JTKSM under Act 446 and confirms the hostel meets worker housing standards. The Certificate of Completion and Compliance (CCC) is a separate building-law document, issued by the local authority, that employers must submit as supporting evidence during the Act 446 application.
How long does approval typically take?
Generally 21–45 working days from submission, subject to complete documentation and successful inspection. Delays may occur if rectification works are required.
What happens if the accommodation fails inspection?
A notice of non-compliance is issued. Employers must complete rectification works within the stipulated period (commonly 30–60 days) and arrange re-inspection before certification.
How long is the Certificate of Accommodation valid?
Generally valid for three (3) years. Renewal applications should be submitted 60–90 days before expiry to avoid compliance gaps.
What are the penalties for non-compliance?
Fines up to RM50,000 per worker, imprisonment up to 2 years for responsible persons, suspension or revocation of certification, and restrictions on employing foreign workers.
Does JTKSM inspect certified hostels again before renewal?
Yes. Certification isn't a one-time check — JTKSM can carry out follow-up or complaint-triggered inspections at any point during the 3-year validity period, separate from the scheduled renewal inspection. A worker complaint, workplace incident, or routine labour audit can each prompt an unscheduled visit, and a mid-cycle failure carries the same Section 24D penalties as failing the initial certification inspection.
Apakah itu Akta 446? Bahasa Malaysia
Akta 446 ialah Akta Standard Minimum Perumahan, Penginapan dan Kemudahan Pekerja 1990 — undang-undang yang mewajibkan majikan yang menyediakan penginapan untuk 5 pekerja atau lebih memperoleh Sijil Penginapan daripada JTKSM. Kegagalan mematuhi boleh dikenakan denda sehingga RM50,000 seorang pekerja dan penjara sehingga 2 tahun di bawah Seksyen 24D.
Related Resources

Workforce Management & Compliance

Hostel & Transportation

Comprehensive management of worker housing and transit logistics, fully aligned with Act 446 requirements.

Learn more

OSHA 1994 Compliance

Ensuring workplace safety standards meet Malaysian occupational health and safety regulations.

Learn more

RBA & SMETA Audits

Supporting ethical supply chain compliance with Responsible Business Alliance and Sedex audit frameworks.

Learn more

Recruitment Process

Legal sourcing, screening, and onboarding of foreign workers with full compliance to MOHA guidelines.

Learn more

Ready to achieve Act 446 compliance?

Don't wait for an inspection notice. Our compliance specialists provide end-to-end support from initial assessment to certificate issuance.